Lake near Bloomington being drained for dam work - 13 WTHR Indianapolis

Lake near Bloomington being drained for dam work

Posted: Updated:
  • HeadlinesHeadlines

  • Monday, May 20 2013 1:28 AM EDT2013-05-20 05:28:32 GMT
    Tony Parker had 20 points and nine assists, Kawhi Leonard scored 18 points and the San Antonio Spurs struck first in the Western Conference finals by beating the Memphis Grizzlies 105-83 on Sunday. The
    Tony Parker had 20 points and nine assists, Kawhi Leonard scored 18 points and the San Antonio Spurs struck first in the Western Conference finals by beating the Memphis Grizzlies 105-83 on Sunday.
  • Monday, May 20 2013 1:24 AM EDT2013-05-20 05:24:45 GMT
    One of several tornadoes spawned by a powerful storm system rumbling through the Plains and Midwest has leveled several mobile homes in an area southeast of Oklahoma City. Reports of injuries in the
    One of several tornadoes spawned by a powerful storm system rumbling through the Plains and Midwest has leveled several mobile homes in an area southeast of Oklahoma City. One man was found dead there.
  • Monday, May 20 2013 12:00 AM EDT2013-05-20 04:00:01 GMT
    The Indianapolis 500 does not start without Jim Nabors and the Pacers don't advance in the NBA Playoffs without hearing at least one "boom baby" from Slick Leonard. Some traditions you just don't mess
    The last time the Pacers played on race day was 2004. It will happen again Sunday, opening the possibilities for fans to see both.  They might even get tickets to both for $100 total.
BLOOMINGTON -

A small lake near Bloomington will be drained this summer so that its dam can be repaired.

Officials say the Griffy Lake dam needs cracks to its spillway fixed, along with a gate replaced and removal of vegetation and debris. City of Bloomington Utilities spokesman Jon Callahan tells The Herald-Times that repair work is expected to begin in September after the water level is lowered over the summer.

A federal grant the city received for repairs to the dam and spillway require the work be completed by the end of 2013.

The city parks department also plans to remove more than 20 years of sediment that have built up in the lake, making it difficult for boaters to access the docks and pass under a causeway.

(Copyright 2012 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)

 

Powered by WorldNow
Links to the FCC website to view WTHR and/or WALV’s on-line public inspection files:
WTHR: https://stations.fcc.gov/station-profile/WTHR   ||   WALV: https://stations.fcc.gov/station-profile/WALV
Individuals with disabilities may contact Jill Pursell at publicfile@wthr.com, or 317.655.5602, for assistance with access to the public inspection files.
Powered by WorldNowAll content © Copyright 2000 - 2013 WorldNow and WTHR. For more information on this site, please read our Privacy Policy and Terms of Service.